What a bathroom renovation really costs in Melbourne

Most bathroom renovations in Melbourne cost between $15,000 and $35,000. A small cosmetic refresh can start around $8,000; a large or high-end room can run $35,000 and up.

Planning ranges, not promises · Last reviewed July 2026
Oak vanity, pale stone basin and brushed nickel tap showing typical bathroom finish choices

The final number depends less on room size than on what happens behind the walls.

Here’s the part most people don’t expect: a small bathroom still needs plumbing, electrical work, waterproofing and tiling. Those costs do not shrink just because the room is small.

Three useful price tiers

Use these to orient your brief—not to replace a written quote.

Cosmetic refresh

Tier 01$8,000–$15,000

New tiles, vanity, toilet, tapware and shower screen, with everything staying where it is. No moving plumbing.

Mid-range rebuild

Tier 02$15,000–$35,000

A full strip-out and rebuild with quality tiles and fixtures. Moving plumbing and custom work add cost.

High-end

Tier 03$35,000+

Premium materials, custom cabinetry, feature tiling, a freestanding bath or major layout changes. Luxury projects can pass $60,000.

A small room still has a full stack of work.

Some costs exist before you choose a single tap. Room size changes quantities; it does not remove the sequence.

What drives the price up or down

The cheapest-looking quote is not always the smallest final bill. Compare the same inclusions and assumptions.

Moving plumbing
Keeping the toilet, basin and shower where they are is one of the biggest savings available. Relocation means new pipework and may trigger other approvals depending on the work.
Tiles
Standard ceramic may be around $30–$40 per square metre; premium stone or large-format tile can be $80–$120+ before installation.
Fixtures
A built-in bath may sit near $1,500 while a designer freestanding bath can reach $5,000 or more. Similar gaps apply to vanities, tapware and screens.
Waterproofing
Wet-area work must be properly designed and installed. AS 3740 sets requirements for waterproofing domestic wet areas.
Hidden problems
Rot, mould, asbestos or failing plumbing can surface after demolition. Hold a 10–15% contingency rather than spending every dollar on selections.
Bathroom stripped back to timber studs and plumbing during a renovation, with water staining visible below the window
Generated documentary concept · what a quote cannot fully see before demolition

The expensive surprise is often invisible at quote time.

Wall linings can conceal old pipework, water damage and unsuitable substrates. A clear quote should say how discoveries are assessed, priced and approved before extra work begins.

  • Ask what investigation is included before demolition
  • Request a written variation process
  • Keep part of the budget uncommitted
Generated after concept of an updated bathroom with green tile and timber vanity
Generated after concept · the same footprint can carry very different material and labour allowances.

Two quick examples

These rooms show the difference in scope—not two versions of the same budget.

A modest refreshed ensuite with standard white vanity, framed shower and affordable ceramic tiles

Small ensuite

Cosmetic refresh, nothing moved

$8,000–$14,000Standard fittings · existing layout · simple tile choices
A rebuilt family bathroom with built-in bath, walk-in shower, timber vanity and sage tiles

Family bathroom

Complete rebuild, mid-range finishes

$18,000–$35,000Full strip-out · bath and separate shower · more tile and storage

Your quote will differ. These are ranges to plan around, not promises. Images are generated editorial examples, not completed projects.

Don’t spend the contingency on the bathroom you can see.

If the working project budget is $30,000, holding back 10–15% means keeping roughly $3,000–$4,500 available for discoveries and necessary changes.

$25,500
planned scope and selections
$4,500
maximum 15% contingency

Permits, plumbing and registration

Do not assume a permit is—or is not—needed from a simple list online. Structural work requires a building permit; other requirements depend on the exact scope. Confirm with a registered building surveyor before starting.

One threshold worth knowing

For domestic building work over $10,000, Victorian requirements generally include a written major domestic building contract and an appropriately registered practitioner when the work falls within the registration rules. Plumbing must be done by an appropriately licensed or registered plumber, with compliance certification required for prescribed plumbing work.

Check the current Victorian guidance ↗